Cairo Festival City-Electrical Substation

The project involved five buildings with a total gross area 2,000 m2.

A high voltage (HV) substation with a capacity of 66kV/22kV, HV equipment, HV cabling of total length 115km and fibre optics cables with a total length of 46 km.

Comunicaţi cu noi
Muir Smith

Muir Smith
Regional Director, Egypt